EU Construction & Demolition Waste Management Protocol / 2024

ID 22535 | | Visite: 1943 | Documenti Ambiente UEPermalink: https://www.certifico.com/id/22535

EU Construction   Demolition Waste Management Protocol   2024

EU Construction & Demolition Waste Management Protocol / 2024 (including guidelines for pre-demolition and pre-renovation audits of construction works)

ID 22535 | 10.09.2024 / In allegato

Ad Agosto 2024 è stato pubblicato l’aggiornamento di:

Protocollo sulla gestione dei rifiuti C&D in UE
Linee guida per gli audit sui rifiuti prima dei lavori di demolizione e ristrutturazione degli edifici.

La Commissione UE ha introdotto tali documenti per aiutare gli operatori a migliorare le pertinenti pratiche in tutta Europa della gestione dei rifiuti da costruzione e demolizione.

Sebbene questi documenti non siano giuridicamente vincolanti e non sostituiscano la legislazione nazionale, sono strumenti importanti per aiutare gli attori locali nella gestione dei rifiuti C&D.
_______

Construction and demolition waste (CDW) is the largest waste stream in the EU, representing almost 40% of the total waste generated. It is estimated that the total CDW outflow as a result of demolition and renovation activities will double, in absolute terms, between 2020 and 2050.

The amount of recovered CDW has increased over time, thanks to EU initiatives promoting preparing for re-use and recycling. However, most CDW is treated primarily by backfilling or low-grade recovery. Although re-use, preparing for reuse and recycling options exist, they are not sufficiently implemented. Evidence also shows that by increasing re-use, preparing for re-use and high-quality recycling of CDW in the EU, significant amounts of GHG emissions could be saved, thereby providing an important contribution to mitigating climate change.

More material efficiency and circularity in CDW management could contribute to the overall circularity of the EU economy, the reduction of environmental impacts from mining and production of primary raw materials as well as EU access to critical and strategic raw materials.

The waste hierarchy provides clear guidance on the prioritisation of waste management options and should be considered in C&D projects and CDW management.

Figure 1 The compass for EU waste management is the five step

Figure 1 The compass for EU waste management is the five-step «waste hierarchy» set up in the Waste Framework Directive. It establishes an order of preference for managing and disposing of waste

Regulatory, technical, economic and awareness barriers hinder the widespread preparing for re-use and recycling of CDW in the EU.

CDW management varies country by country and depends on national legislation, established practices and infrastructure. Poor demolition and collection practises represent a bottleneck, as resources from demolition and renovation may often be contaminated and cannot easily be prepared for re-use or recycled. Perceived high costs of recycling and other economic constraints contribute to the lack of well-functioning markets for some CDW fractions, and the lack of knowledge of recycling schemes and other solutions and coordination between actors represents yet another barrier.

The ‘EU Construction & Demolition Waste Management Protocol’ and the ‘Guidelines for waste audits before demolition and renovation works of buildings’ were initially published in, respectively, 2016 and 2018.

Their aim was to increase confidence in the CDW management process and the trust in the quality of CDW recycled materials, by sharing a set of rules and best practices to function as inspiration for practitioners and policymakers.

While the objective of the revision of the Protocol - which now incorporates the guidelines for audits before demolition and renovation works of buildings - is to bring the document in line with recent policy and technological developments, its overall aim remains unchanged:

This revised Protocol aims to enhance CDW 2024

This revised Protocol aims to enhance CDW management processes at all stages of the value chain and increase the confidence in the quality of products prepared for re-use and materials for recycling. This document sets a number of rules and includes examples of best practices, technologies and tools from across the EU in the following areas:

- Identification of CDW and construction products through pre-demolition and pre-renovation audits
- Selective demolition
- Source separation and collection
- Preparing for re-use and recycling
- Waste logistics
- Waste processing
- Quality management
- Policy and framework conditions.

Achieving the aims of the Protocol requires know-how and cooperation between all stakeholders of the value chain.

add attached

EU Publications: 17.08.2024 - Updated edition 2024

Collegati

Descrizione Livello Dimensione Downloads
Allegato riservato EU Construction - Demolition Waste Management Protocol - 2024.pdf
 
2589 kB 53

Tags: Ambiente Rifiuti Abbonati Ambiente

Ultimi archiviati Marcatura CE

Mag 13, 2025 236

Circolare Ministero dell'Interno 29 agosto 2005

Circolare Ministero dell'Interno del 29 agosto 2005 ID 23969 | 13.05.2025 / In allegato Circolare Ministero dell'Interno del 29 agosto 2005Decreto legge 27 luglio 2005, n. 144, recante misure urgenti per il contrasto del terrorismo internazionale, convertito con modificazioni dalla legge 31 luglio… Leggi tutto
Decreto Legislativo 29 dicembre 1992 n  517
Apr 25, 2025 833

Decreto Legislativo 29 dicembre 1992 n. 517

Decreto Legislativo 29 dicembre 1992 n. 517 / Strumenti per pesare a funzionamento non automatico ID 23880 | 25.04.2025 Decreto Legislativo 29 dicembre 1992 n. 517Attuazione della direttiva 90/384/CEE in materia di strumenti per pesare a funzionamento non automatico, codificata nella direttiva… Leggi tutto
Apr 25, 2025 775

Direttiva delegata (UE) 2015/13

Direttiva delegata (UE) 2015/13 ID 23879 | 25.04.2025 Direttiva delegata (UE) 2015/13 della Commissione, del 31 ottobre 2014, che modifica l'allegato III della direttiva 2014/32/UE del Parlamento europeo e del Consiglio, per quanto riguarda il campo di portata dei contatori dell'acqua. (GU L 3 del… Leggi tutto
Guidance on Dock shelters
Apr 23, 2025 776

Guidance on Dock shelters

Guidance on Dock shelters (FEM - October 2024) ID 23864 | 23.04.2025 / Attached Intention of this Guideline To provide users, architects, contractors and suppliers with an awareness of the benefits and specific characteristics of the different Dock shelter types used in the loading dock area.A dock… Leggi tutto
Apr 01, 2025 815

Decreto Dirigenziale n. 40 del 14.03.2025

Decreto Dirigenziale n. 40 del 14.03.2025 ID 23718 | 31.03.2025 Nuovi programma e modalità d'esame per il conseguimento del titolo professionale di ufficiale di navigazione del diporto di 2a classe, ai sensi dell’articolo 4-bis, comma 2, lettera h), del decreto del Ministero delle infrastrutture e… Leggi tutto
Cambiamenti ambientali globali e dispositivi medici
Feb 18, 2025 463

Cambiamenti ambientali globali e dispositivi medici: un primo studio integrato

Cambiamenti ambientali globali e dispositivi medici: un primo studio integrato ID 23848 | 18.02.2025 / In allegato L’Istituto Superiore di Sanità, su richiesta del Ministero della Salute, ha effettuato uno studio sul ruolo che i dispositivi medici possono ricoprire nella mitigazione degli effetti… Leggi tutto

Più letti Marcatura CE

Dic 18, 2024 124343

Regolamento Prodotti da Costruzione (UE) 305/2011 - CPR

Regolamento CPR (UE) 305/2011 ID 518 | Update news 18.12.2024 / In allegato Regolamento (UE) N. 305/2011 del Parlamento Europeo e del Consiglio del 9 marzo 2011 che fissa condizioni armonizzate per la commercializzazione dei prodotti da costruzione e che abroga la direttiva 89/106/CEE del… Leggi tutto