ID 11650 | | Visite: 2957 | Documenti Chemicals EntiPermalink: https://www.certifico.com/id/11650

EIGA 233 20

Emergency Response Planning

Doc. EIGA 233/20 

Companies are required to take reasonable measures to prevent emergency situations such as fires or leaks from happening, but emergencies are still possible on any site. Every site should therefore have an emergency plan and the necessary resources in place: designated spaces, equipment and people organised to manage the potential emergencies to reduce harm to employees, the public and the environment or damage to facilities.

This publication describes the key elements of a robust emergency management system to formally assure preparedness using an emergency plan.

This publication is intended to identify key elements and good practices for an emergency management system for EIGA member company operating sites. There may be additional and / or specific requirements for sites falling under SEVESO legislation, for more information see EIGA Doc 60, Seveso Documents – Guidance on Applicability, Assessment and Legal Documents for Demonstrating Compliance of Industrial Gases Facilities with Seveso Directive(s).

This publication is intended to address on-site emergencies (possibly with offsite effects).

The emergency management system described in this publication is not intended to meet emergency response of other offsite locations or situations such as:

- pipelines;
- road / transport emergencies;
- events involving member company employees performing work on customer sites;
- events at construction sites;
- crisis management, see EIGA Doc 923, Guidelines for Crisis Management;
- product recall (such as medical or quality recalls), see EIGA Doc 923; and
- high or complex buildings.

Actions to be taken under any offsite emergency plan are excluded from this publication.

NOTE The actions expected of drivers delivering or collecting industrial gas products out of hours should be assessed and controlled as part of driver site access authorisation process. It is therefore excluded from most site emergency plans and considered outside the scope of this EIGA publication.

_______

Table of Contents
1 Introduction
2 Scope and purpose
2.1 Scope
2.2 Purpose
3 Definitions
3.1 Publications terminology
3.2 Technical definitions
4 Emergency response management system requirements
4.1 Company emergency management system
5 Site emergency response plan
5.1 Elements to be considered when writing emergency plans
5.2 Define roles and responsibilities
5.3 Define resources, equipment
5.4 Evacuation plans (when, how far, duration)
5.5 Closing emergency, return to normal business
6 Training and exercises
6.1 Person initiating site evacuation
6.2 Employee general training
6.3 Emergency response team training
6.4 Practical scenario exercises, what-if, tabletop exercises
6.5 Evacuation exercises
7 Periodic review
7.1 Testing and inspection
7.2 Auditing
7.3 Company emergency management system review
8 References
9 Other References

Fonte: EIGA

Collegati:

Descrizione Livello Dimensione Downloads
Allegato riservato Emergency response planning.pdf
Doc. 233/2020
268 kB 4

Tags: Chemicals Rischio Incidente Rilevante EIGA Abbonati Chemicals

Più letti Impianti

Ultimi archiviati Impianti

Regolamento di esecuzione  UE  2025 655
Apr 03, 2025 791

Regolamento di esecuzione (UE) 2025/655

Regolamento di esecuzione (UE) 2025/655 ID 23733 | 03.04.2025 Regolamento di esecuzione (UE) 2025/655 della Commissione, del 2 aprile 2025, recante modalità di applicazione del regolamento (UE) 2023/1804 del Parlamento europeo e del Consiglio per quanto riguarda le specifiche e le procedure… Leggi tutto
Modulistica istanze autorizzazioni infrastrutture comunicazioni elettroniche   Marzo 2025
Mar 11, 2025 1435

Decreto 14 febbraio 2025

Decreto 14 febbraio 2025 ID 23614 | 11.03.2025 Decreto 14 febbraio 2025 Modifiche all'allegato 12-bis al decreto legislativo 1° agosto 2003, n. 259 (Codice delle comunicazioni elettroniche). (GU Serie Generale n.58 dell'11.03.2025)________ Decreto Legislativo 1° agosto 2003 n. 259 ALLEGATO 12-BIS… Leggi tutto
Mar 10, 2025 1342

DM 30 dicembre 2024 n. 457

DM 30 dicembre 2024 n. 457 ID 23594 | 10.03.2025 / In allegato Meccanismo transitorio di supporto per impianti a fonti rinnovabili con costi di generazione vicini alla competitività di mercato di cui agli articoli 6 e 7 del decreto legislativo 8 novembre 2021, n.199 con validità massima al 31… Leggi tutto
Mar 10, 2025 1830

Deliberazione ARERA 78/2025/R/EFR

Deliberazione ARERA 78/2025/R/EFR / SSP - Scambio Sul Posto - Stop al meccanismo ID 23593 | 10.03.2025 / In allegato ARERA con la delibera n. 457/2024 del 4 marzo 2025 (di cui al DM 30 dicembre 2024 n. 457 in attuazione di quanto previsto dall'art. 9, comma 2 del Decreto Legislativo 199/2021), ha… Leggi tutto
Operation   Maintenance EU solar 2025
Feb 24, 2025 764

Operation & Maintenance Best Practice Guidelines / SolarPower Europe - 2025

Operation & Maintenance Best Practice Guidelines / SolarPower Europe - 2025 ID 23153 | 24.02.2025 Operation and Maintenance (O&M) has become a standalone segment within the solar industry, and it is widely acknowledged by all stakeholders that high-quality O&M services mitigate potential risks,… Leggi tutto