This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables
ID 2366 | 28.05.2025 / In allegato

Report 09 del 28/02/2020 N. 10 A12/00319/20 Svezia
Approfondimento tecnico: Cavo USB
Il prodotto, di marca sconosciuta, codice a barre 7322130907...
Rettifica del regolamento delegato (UE) 2019/2013 della Commissione, dell’11 marzo 2019, che integra il regolamento (UE) 2017/1369 del Parlamento euro...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024