Slide background
Slide background




Faq Regolamento (UE) 305/2011 (CPR)

ID 4703 | | Visite: 8558 | Documenti Marcatura CE UEPermalink: https://www.certifico.com/id/4703

Faq Regolamento (UE) 305/2011 (CPR)

European Commission - Ottobre 2017

FAQ covering the Construction Products Regulation (CPR)

What is the meaning of "placing on the market"?
What is the "Appropriate Technical Documentation" foreseen in Article 36 of the Construction Products Regulation (CPR)?
What shall a manufacturer do if certain clauses in the harmonised standard are not in line with the provisions of the Construction Products Regulation (CPR)?
Where can somebody obtain information on the requirements applicable to a product in a specific Member State?
Are Notified Bodies expected to check whether the manufacturer meets his obligations under the Construction Products Regulation (CPR)?
Which is the meaning of the phrase "the last two digits of the year in which the marking was first affixed", in Article 9(2) of the Construction Products Regulation (CPR)?
What is the importance of the installation manual / instructions?
Is there any obligation to provide a declaration of performance (DoP) for a construction product not covered by a harmonised European (hEN) standard? Can a Member State impose such an obligation?
Where can I find and consult the latest lists of harmonised European standards (hEN) published in the Official Journal of the European Union (OJEU)?
Is it allowed to affix a quality or private mark concerning performance for construction products which are covered by a harmonised European standard (hEN) cited in the Official Journal of the European Union (OJEU)?
Can construction products provided with national marking be placed on the market after 1st July 2013 (and if so in what cases)?
Is it allowed for quality or private marks to quote the same essential characteristics as CE-marking?
Is it possible to issue within the territory of a Member State of the EU after 1st July 2013 a national technical specification (e.g. a technical standard) for a construction product?
Are the Member States allowed to impose further requirements if these are, for example based on the products’ chemical composition, in order to protect the health of construction workers and other people? If that should be permitted, doesn’t it interfere with the free movement of goods?
A retailer sells a product, which is not manufactured by himself/herself, using the retailer's own name. May the retailer use the declaration of performance (DoP) drawn up by the real manufacturer? If not, does the DoP drawn up by the retailer need to be based on certification granted by a notified body?
If a declaration of performance (DoP) is required, does the testing of the product need to be redone every year and a new DoP issued or remains the DoP valid if the product does not change?
Is the "Blue Guide" published by the Commission applicable also to construction products?
Which are the "competent national authorities" under Art 11(8) which may request the manufacturer to provide them with all the information and documentation necessary to demonstrate the conformity of the construction product with the declaration of performance and compliance with other applicable requirements?
Does the manufacturer have to include in the CE marking also the essential characteristics for which in the Declaration of Performance (DoP) he has declared NPD?
Does the contact address required under the CPR Article 11(5) have to be in the Member State where the product is made available on the market? Or could the contact address be in any EU Member State?
How can I find out if a product certificate/test report is false or not?
When does the CE marking have to be affixed on the basis of EN 1090-1:2009+A1:2011 ?
I have seen several versions of a harmonised standard; which is the one to use when drawing up the Declaration of Performance/CE marking?
What does the CE marking on a construction product mean?
What happens if several EU legislative acts apply to a construction product?
For which essential characteristics should the manufacturer declare the performance of his product?
Where do I find information on which harmonised European standards have been published and are relevant under the CPR?
What is considered a micro-enterprise to which simplified procedures could apply?
Is the use of Annex ZA under the CPR obligatory?
Is my product a construction product? If yes, what does the CPR require me to do?
Which languages do the various accompanying documents and CE marking of a construction product need to be in?
What are the obligations of a retailer (distributor) who sells construction products under the manufacturer's name?


Fonte: Commissione Europea

Correlati:

Descrizione Livello Dimensione Downloads
Allegato riservato FAQ covering the Construction Products Regulation (CPR).pdf
European Commission 2017
816 kB 25

Tags: Marcatura CE Regolamento CPR Abbonati Marcatura CE

Ultimi archiviati Marcatura CE

Guidelines of CE marking in laser machines
Gen 07, 2025 117

Guidelines of CE marking in laser machines

Guidelines of CE marking in laser machines / CECIMO July 2022 ID | 07.01.2025 Machinery and equipment which are bound by specific European Directives cannot be placed on the single market unless they bear, among other things, the CE marking. CE marking affixed on a product indicates that the… Leggi tutto
Regolamento di esecuzione  UE  2018 608   MED
Gen 03, 2025 108

Regolamento di esecuzione (UE) 2018/608

Regolamento di esecuzione (UE) 2018/608 / Criteri tecnici etichette elettroniche equipaggiamento marittimo (MED) ID 23243 | 03.01.2025 Regolamento di esecuzione (UE) 2018/608 della Commissione, del 19 aprile 2018, che stabilisce i criteri tecnici relativi alle etichette elettroniche per… Leggi tutto
Dic 13, 2024 171

Regolamento delegato (UE) 2024/3173

Regolamento delegato (UE) 2024/3173 ID 23106 | 13.12.2024 Regolamento delegato (UE) 2024/3173 della Commissione, del 27 agosto 2024, che integra il regolamento (UE) 2023/988 del Parlamento europeo e del Consiglio per quanto riguarda l’accesso al sistema di allarme rapido Safety Gate e il suo… Leggi tutto
Regolamento di esecuzione  UE  2024 2958 Indicatori di risultato
Dic 02, 2024 213

Regolamento di esecuzione (UE) 2024/2958

Regolamento di esecuzione (UE) 2024/2958 / Indicatori di risultato Regolamento Sicurezza Generale dei Prodotti (GSPR) ID 23047 | 02.12.2024 Regolamento di esecuzione (UE) 2024/2958 della Commissione del 29 novembre 2024 che stabilisce gli indicatori di risultato rilevanti ai fini del regolamento… Leggi tutto

Più letti Marcatura CE

Dic 18, 2024 119273

Regolamento Prodotti da Costruzione (UE) 305/2011 - CPR

Regolamento CPR (UE) 305/2011 ID 518 | Update news 18.12.2024 / In allegato Regolamento (UE) N. 305/2011 del Parlamento Europeo e del Consiglio del 9 marzo 2011 che fissa condizioni armonizzate per la commercializzazione dei prodotti da costruzione e che abroga la direttiva 89/106/CEE del… Leggi tutto