Slide background
Certifico: Informazione tecnica HSE / 25° anno

/ Documenti disponibili: 43.877
/ Totale documenti scaricati: 31.137.031

Vedi Abbonamenti, Prodotti tecnici e Software 2025

* Dati in real-time da Aprile 2014 alla data odierna.
 
Slide background
Slide background
Certifico 2000/2024: Informazione Utile




/ Documenti disponibili: 43.877 *

/ Totale documenti scaricati: 31.137.031 *

Vedi Abbonamenti, Prodotti e Software 2024


* Dati in real-time da Aprile 2014 alla data odierna.
Slide background
Certifico 2000/2024: Informazione Utile

/ Documenti disponibili: 43.877 *

/ Totale documenti scaricati: 31.137.031 *

Vedi Abbonamenti Promo 2023


* Dati in real-time da Aprile 2014 alla data odierna.
Slide background
Slide background
Certifico 2000/2023: Informazione Utile

/ Documenti disponibili: 43.877 *

/ Totale documenti scaricati: 31.137.031 *


Vedi Abbonamenti Promo 2023


* Dati in real-time da Aprile 2014 alla data odierna.
Slide background
Certifico 2000/2023: Informazione Utile

Slide background
Certifico 2000/2023: Informazione Utile

Slide background
Certifico 2000/2023: Informazione Utile

Abbonamenti Promo fino al 20 Agosto - 20% ticket "CERTIFICO20"

Vedi Abbonamenti Promo: 2X, 3X, 4X, Full | 2023
Slide background
Certifico 2000/2023: Informazione Utile

Abbonamenti Promo fino al 20 Agosto - 20% ticket "CERTIFICO20"

Vedi Abbonamenti Promo: 2X, 3X, 4X, Full | 2023
Slide background
Certifico 2000/2023: Informazione Utile

/ Documenti disponibili: 43.877 *

/ Totale documenti scaricati: 31.137.031 *

Vedi Abbonamenti Promo 2023

* Dati in real-time da Aprile 2014 alla data odierna.
Slide background
Certifico 2000/2022: Informazione Utile

/ Documenti disponibili: 43.877 *

/ Totale documenti scaricati: 31.137.031 *


Vedi Abbonamenti Promo 2022

* Dati in real-time da Aprile 2014 alla data odierna.
Slide background
Certifico 2000/2022: Informazione Utile

Tutti i Software, Prodotti e Documenti Tecnici presenti sono elaborati direttamente

o selezionati su Norme Tecniche & Standards riconosciuti.


Vedi Abbonamenti Promo: 2X, 3X, 4X, Full | 2022
Slide background
Certifico 2000/2021: Informazione Utile

Tutti i Software, Prodotti e Documenti Tecnici presenti sono elaborati direttamente

o selezionati su Norme Tecniche & Standards riconosciuti.

Vedi Abbonamenti Promo: 2X, 3X, 4X, Full | 2021








Europe, Rome

CEI EN IEC 61439-1:2022: Verifiche di progetto ed individuali

ID 21881 | | Visite: 4438 | Documenti Riservati NormazionePermalink: https://www.certifico.com/id/21881

CEI EN IEC 61439 1 Verifiche

CEI EN IEC 61439-1:2022: Verifiche di progetto ed individuali

ID 21881 | 19.05.2024 / Documento di approfondimento in allegato

Documento di approfondimento sulle verifiche di progetto e le verifiche individuali sui quadri elettrici in accordo ai capitoli 10 e 11 della CEI EN IEC 61439-1:2022.

Verifica di progetto: verifica eseguita su un quadro campione o su parti di quadro per dimostrare che il progetto soddisfa le prescrizioni della relativa norma del quadro.

Verifica individuale: verifica eseguita su ciascun quadro durante e/o dopo la fabbricazione per confermare che il quadro soddisfi le prescrizioni della relativa norma del quadro.

La verifica di progetto è prevista per verificare la conformità del progetto di un quadro o di un sistema di quadri con le prescrizioni di questa serie di norme.

Un quadro che è stato verificato in accordo con la CEI EN IEC 61439-1:2022 dal costruttore originale ed è stato realizzato o assemblato da un altro costruttore non richiede la ripetizione delle verifiche originarie di progetto se tutte le prescrizioni e le istruzioni specificate e fornite dal costruttore originale sono state pienamente soddisfatte. Se il costruttore del quadro installa delle proprie disposizioni che non sono comprese nelle verifiche fatte dal costruttore originale, il costruttore del quadro, per quanto riguarda queste disposizioni, diventa il costruttore originale.

La verifica individuale ha lo scopo di individuare i difetti nei materiali e nella fabbricazione e di accertare il corretto funzionamento del quadro assemblato. Essa è eseguita su ogni quadro. Il costruttore del quadro deve stabilire se la verifica individuale è effettuata durante e/o dopo l’assemblaggio. Se del caso, la verifica individuale deve confermare che la verifica di progetto sia documentata.

La CEI EN IEC 61439-1:2022 (Ed. 3a) sostituisce l’edizione 2012 che resta applicabile fino al 21.05.2024.

A partire dal 22.05.2024 è in vigore solo la norma CEI EN IEC 61439-1:2022 (Ed. 3a).

Verifiche di progetto

1. Costruzione:

- Robustezza dei materiali e delle parti del quadro;
- Grado di protezione IP del quadro;
- Distanze d’isolamento (in aria e superficiali);
- Protezione contro la scossa elettrica ed integrità dei circuiti di protezione;
- Installazione degli apparecchi di manovra e dei componenti;
- Circuiti elettrici interni e collegamenti;
- Terminali per conduttori esterni.

2. Prestazioni:

- Proprietà dielettriche;
- Sovratemperatura;
- Resistenza al cortocircuito;
- Compatibilità elettromagnetica (EMC).

Verifiche individuali

1. Costruzione:

- grado di protezione contro il contatto con parti attive pericolose e dell’involucro;
- distanze di isolamento in aria e superficiali;
- protezione contro la scossa elettrica ed integrità dei circuiti di protezione;
- installazione degli apparecchi di manovra e dei componenti;
- circuiti elettrici interni e collegamenti;
- terminali per conduttori esterni;
- funzionamento meccanico.

2. Prestazioni:

- proprietà dielettriche;
- cablaggio, prestazioni in condizioni operative e funzionalità.

Estratto CEI EN IEC 61439-1:2022

[…]

10.2 Strength of materials and parts

10.2.1 General

The mechanical, electrical and thermal capability of constructional materials and parts of the assembly shall be deemed to be proven by verification of construction and performance characteristics.

Where an empty enclosure in accordance with IEC 62208:2011 is used, and it has not been modified so as to degrade the performance of the enclosure, no repetition of the enclosure testing to 10.2 is required.

10.2.2 Resistance to corrosion

10.2.2.1 Verification by test

The resistance to corrosion of representative samples of ferrous metallic enclosures, including internal and external ferrous metallic constructional parts of the assembly, shall be verified.

The test shall be carried out on:

- an enclosure or representative sample enclosure with representative internal parts in place and door(s) closed as in normal use, or
- representative enclosure parts and internal parts separately.

In all cases, hinges, locks and fastenings shall also be tested unless they have previously been subjected to an equivalent test and their resistance to corrosion has not been compromised by their application.

Where the enclosure is subjected to the test, it shall be mounted as in normal use according to the original manufacturer's instructions.

The test specimens shall be new and in a clean condition and shall be subjected to severity test A or B, as detailed in 10.2.2.2 and 10.2.2.3.

NOTE The salt mist test provides an atmosphere that accelerates corrosion and does not imply that the assembly is suitable for a salt-laden atmosphere.

[...]

11.2 Degree of protection against contact with hazardous live parts, ingress of solid foreign bodies and water of enclosures

A visual inspection is necessary to confirm that the assembly meets the prescribed measures to achieve the designated degree of protection.

11.3 Clearances and creepage distances

Where the clearances are:

– less than the values given in Table 1, an impulse voltage withstand test in accordance with 10.9.3 shall be carried out;
– not evident by visual inspection to be larger than the values given in Table 1 (see 10.9.3.5), verification shall be by physical measurement or by an impulse voltage withstand test in accordance with 10.9.3;
– evidently larger by visual inspection than the values given in Table 1, verification may be carried out only by visual inspection.

The prescribed measures with regard to creepage distances (see 8.3.3) shall be subject to a visual inspection. Where it is not evident by visual inspection, verification shall be by physical measurement. No reduction on the values given in Table 2 is acceptable.

11.4 Protection against electric shock and integrity of protective circuits

The prescribed protective measures with regard to basic protection and fault protection (see 8.4.2 and 8.4.3) shall be subject to a visual inspection.

The protective circuits shall be checked by inspection to ascertain that the measures prescribed in the manufacturer’s instructions are adhered to and verified. When it is not obvious by inspection that the earth continuity of the protective circuits meets the requirement of 8.4.3.2, a continuity test according to 10.5.2 shall be made.

Screwed and bolted connections shall be checked for the correct tightness on a random basis.

[...]

Table 1 - Minimum clearances in air (8.3.2)

Capitolo 11 Tabella 1

[...]

Table 11 - Copper test conductors for rated currents up to 400 A inclusive (10.10.2.3.2)

Capitolo 11 Tabella 11

[...]

Table 13 - Short-circuit verification by comparison with reference designs: checklist (10.5.3.3, 10.11.3 and 10.11.4)

Capitolo 11 Tabella 13

[...] segue in allegato

Fonti
CEI EN IEC 61439-1:2022

Certifico Srl - IT/EN | Rev. 0.0 2024
©Copia autorizzata Abbonati

Matrice Revisioni:

Rev. Data Oggetto Autore
0.0 19.05.2024 -- Certifico Srl

Collegati

DescrizioneLinguaDimensioneDownloads
Scarica questo file (CEI EN IEC 61439-1 2022 Verifiche di progetto ed individuali Rev. 00 2024.pdf)CEI EN IEC 61439-1:2022: Verifiche di progetto ed individuali
Certifico Srl - Rev. 0.0 2024
IT/EN680 kB2086

Tags: Normazione EN 61439 Abbonati Normazione

Ultimi inseriti

Manuale del transito
Lug 13, 2025 84

Manuale del transito

in News
Manuale del transito / CE 2021 ID 24276 | 13.07.2025 Bruxelles, 19 aprile 2021 - TAXUD/A1/TRA/005/2020-1-IT Il piano d’azione per il transito in Europa (1) prevedeva la redazione di un manuale contenente una descrizione dettagliata del regime di transito comune e unionale e una chiara illustrazione… Leggi tutto
Safety Gate
Lug 13, 2025 129

Safety Gate Report 25 del 20/06/2025 N. 04 SR/022253/25 Regno Unito

Safety Gate: Rapid Alert System for Non-Food Consumer Products Report 25 del 20/06/2025 N. 04 SR/022253/25 Regno Unito Approfondimento tecnico: Friggitrice ad aria Il prodotto, di marca Haden, mod. 11L Double Stack Air Fryer, è stato sottoposto alla procedura di richiamo presso i consumatori perché… Leggi tutto
Programma nazionale della pesca e acquacoltura 2025 2027
Lug 12, 2025 181

Decreto 16 aprile 2025

Decreto 16 aprile 2025 / Programma nazionale della pesca e dell'acquacoltura 2025-2027 ID 24272 | 12.07.2025 Decreto 16 aprile 2025 Adozione del Programma nazionale triennale della pesca e dell'acquacoltura 2025-2027. (GU n.160 del 12.07.2025) Leggi tutto

Ultimi Documenti Abbonati

Lug 10, 2025 305

UNI ISO 22340:2025

UNI ISO 22340:2025 / Guidelines for an enterprise protective security architecture and framework ID 24267 | 10.07.2025 / In allegato UNI ISO 22340:2025Sicurezza e resilienza - Sicurezza protettiva - Linee guida per un'architettura e un quadro di sicurezza di protezione aziendale. Data… Leggi tutto
UNI PdR 175 2025
Lug 10, 2025 321

UNI/PdR 175:2025 / Metodologie manutenzione delle tubazioni di scarico a gravità con tecnologie CIPP

UNI/PdR 175:2025 / Metodologie manutenzione delle tubazioni di scarico a gravità con tecnologie CIPP ID 24261 | 10.07.2025 / In allegato UNI/PdR 175:2025Metodologie e sistemi per il rinnovamento, la connessione e la manutenzione delle tubazioni di scarico a gravità (max. 0,5 bar) con tecnologie… Leggi tutto
FAQ   UNI 7129 1 2015 e UNI 11528 2022   Chiarimento sistemi PLT CSST
Lug 07, 2025 576

FAQ - UNI 7129-1:2015 e UNI 11528:2022 - Chiarimento sistemi PLT-CSST

FAQ - UNI 7129-1:2015 e UNI 11528:2022 - Chiarimento sistemi PLT-CSST ID 24237 | 07.07.2025 / In allegato FAQ - UNI 7129-1:2015 e UNI 11528:2022 - Chiarimento sistemi PLT-CSST E’ stato posto al CIG un quesito riguardante la corretta interpretazione sulla regolamentazione dei sistemi PLT-CSST in… Leggi tutto