~ 2000 / 2026 ~
// Documenti disponibili n: 47.479
// Documenti scaricati n: 38.393.604
// Documenti disponibili n: 47.479
// Documenti scaricati n: 38.393.604

This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables

ID 22107 | 24.06.2024
Regolamento di esecuzione (UE) 2024/1740 della Commissione, del 21 giugno 2024, che stabilisce le regole di applicazione del regolamento (U...

Report 41 del 14/10/2022 N. 39 A12/01425/22 Germania
Approfondimento tecnico: Cellulare per uso in atmosfera esplosiva
Il prodotto, di marca Real...

Report 16 del 19/04/2024 N. 04 A12/00964/24 Svezia
Approfondimento tecnico: Gioco per gatti
Il prodotto, di marca Spralla, mod. 17471, è sta...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024