// Documenti disponibili n: 46.319
// Documenti scaricati n: 36.159.775

This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables

Commissione Europea, 19 Dicembre 2017
Regulation (EC) N° 765/2008 (hereinafter also referred to...

della Commissione del 19 agosto 2020 recante modalità di applicazione del regolamento (UE) 2017/745 del Parlamento europeo e del Consiglio per quanto riguarda l...

ID 13362 | Elenco Norme armonizzate Direttiva dispositivi medici 93/42/CEE ad Aprile 2021
Come consultare i riferimenti alle norme a...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024