// Documenti disponibili n: 46.592
// Documenti scaricati n: 36.665.771

This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables

Report 49 del 05/12/2025 N. 37 SR/04210/25 Repubblica Ceca
Approfondimento tecnico: Profumo
Il prodotto, di marca Paco Rabanne, batch number...

ID 25214 | 28.12.2025 / Attached COM(2025) 772 final of 16.12.2025
Il Regolamento sui Prodotti da Costruzione (CPR), ...
Direttiva 93/44/CEE del Consiglio del 14 giugno 1993 che modifica la direttiva 89/392/CEE concernente il ravvicinamento delle legislazioni degli Stati Membri relative alle macchine
(...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024