// Documenti disponibili n: 46.322
// Documenti scaricati n: 36.174.924

This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables

The current EU regulatory framework for in vitro diagnostic medical devices ('IVDs') consi...

Attuazione della direttiva 2008/57/CE e 2009/131/CE relativa all'interoperabilita' del sistema ferroviario comunitario.
(GU n.271 del 19-11-2010 - S.O. n. 255)
E...

Update Maggio 2017
Minutes of the PPE Working Group - 2002 onwards
Working Group Of Committee 98/37/EC in relation to the Personal Protective Equipment (PPE)...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024