// Documenti disponibili n: 46.778
// Documenti scaricati n: 37.100.691

The aim of this recommendation is to identify the different operations (content and periodicity) needed to maintain tower cranes in a safe condition.
It gives also guidance for detection of defects and actions to be taken.
This recommendation should be used in absence of manufacturer's requirements or national regulations.
It can also be a guidance for the manufacturer to establish his requirements.
The manufacturer's instructions have priority over this recommendation.
National regulations shall also be considered.
SCOPE
INSPECTIONS
2.1 Daily inspections
2.2 Frequent inspections
2.3 Periodic inspections
2.4 Thorough inspections
ANNEX A SYNTHESIS OF THE RECOMMENDED INSPECTIONS
ANNEX B LIST OF THE PERIODIC INSPECTIONS TO BE PERFORMED
ANNEX C VERIFICATION OF THE HOOKS
ANNEX D EXAMPLE OF REPORT FOR PERIODIC AND THOROUGH INSPECTIONS
FEM

ATEX is the French acronym for “Atmosphères Explosibles” which translates to Explosive Atmospheres in English.
ATEX is a set of two Europ...

Report 30 del 29/07/2022 N. 13 A12/01093/22 Lituania
Approfondimento tecnico: Crema viso
Il prodotto, di marca FIGARO, Barcode 8004120082658, pro...

ID 890 | Update news 23.10.2019
Update 29.02.2024
Regolamento di esecuzione (UE) 2020/1668 della Commissione del 10 novembre 202...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024