Informazione tecnica HSE / 25 ° anno
/ Documenti disponibili:
44.538
/ Documenti scaricati: 32.464.367
/ Documenti scaricati: 32.464.367
In Europe, degassing of Rail Tank Cars (rtc’s) is mostly done at rtc workshops and not at specialised cleaning stations. Workshops offer this activity as an extra service to their customers.
The degassing operations and associated activities like tank entry and nitrogen purging, are hazardous activities which require the right equipment, skilled personnel, detailed procedures and, above all, a proper safety management system.
The scope of this document includes:
- Degassing (gas freeing) of rtc’s containing flammable gases (LPG, propylene, butadiene, C4 mixtures...)
- Testing the rtc atmosphere during and after degassing
- Tank entry after degassing
- Nitrogen purging
- Labelling and marking of rtc’s, degassed or to be degassed
These guidelines are aimed at advising rtc workshops in order to perform these activities in a safe way.
CEFIC 2012
Regolamento (UE) 2015/491 della Commissione del 23 marzo 2015 che modifica il regolamento (UE) n. 605/2014 recante modifica, ai fini dell'introduzione di indicazioni di perico...
ID 23634 | 14.03.2025
Regolamento (UE) 2024/2929 della Commissione, del 27 novembre 2024, che rettifica la versione in lingua francese dell’allegato XVII del regolamento (CE) ...
ID 19497 | 25.04.2023
Guidance on sampling, analysis and data reporting for the monitoring of miner...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024